The PG&E Tesla Substation is a large (70 acre) 500 kV electric substation between Tracy and Livermore, CA. PA worked with PG&E on a project to do an addition to and remodel a portion of their main control building at the site. The goal of the project was to enlarge conference room, provide additional offices and add a restroom. As a result of the additional occupants, the existing sewage treatment system had to be evaluated to ensure it could handle the additional loading.
Tasks Performed:
- Geologic soils report
- Develop site plan
- Evaluation of existing sewage treatment system
- Building plans for remodel and addition
- Permit assistance