- Land Surveying
Client: Anderson Dragline
Funding Source: Humboldt Waste Management Authority
Project Location: Eureka, CA
Pacific Affiliates was commissioned by Anderson Dragline to provide constrcution staking and QA/QC grade control on Phase 1 of Humboldt Waste Management Authorities re-capping of the Cummins Road Landfill. As part of closure requirements implemented by the California Regional Water Quality Control Board, Anderson Dragline was awarded the contract to strip existing cover soils, install an impermeable liner and re-fill and grade the site based on project designs. Pacific Affiliates provided pre and post constuction surveys, construction boundary staking, grade staking, and construction support through GPS QA/QC of the contractor's grade control systems and equipment. In addition to the field work, Pacific Affiliates completed all cut/fill quantity calculations for use in pay estimates.
Tasks Performed
- Construction Boundary Staking
- Pre/Post Construction Surveys
- Grade Staking
- QA/QC Construction Grade Control Systems
- Quantity Calculations